Free Delivery on all orders over £99*

AV:Link SH30T Stereo TV Headphones with Long Lead

£899
The RRP is the manufacturer's recommended retail price of the item.
100 In Stock - Ready to Ship
We are an Independent UK Company
Price match. Found it cheaper? Contact us
Trade Discount Available
Description

The AV:Link SH30T is a pair of stereo headphones built for television viewing, with a 5m lead that lets you sit back from the screen without pulling on the cable. An in-line volume control sits on the lead, so you can adjust the level without reaching for the remote or the set itself. The extra length means you can watch comfortably from the sofa or across the room.

Sound comes from 30mm neodymium magnet drivers with a frequency response of 20Hz to 20kHz. The impedance is 32 Ohms and sensitivity is rated at 102 ± 3dB, with 100mW of power handling. The result is clear stereo audio in a compact set of headphones. The adjustable headband and low-profile padded earcups (earpads) are made for long-lasting comfort, which matters during a full film or an evening of viewing.

The SH30T terminates in a right-angle 3.5mm stereo jack, and a 6.3mm (quarter-inch) adaptor is included so you can plug into larger amplifiers, hi-fi units and older televisions. When you have finished, the earcups fold flat for safe, space-saving storage. This is a straightforward pair of headphones that covers TV listening and general use without fuss, keeping the wearer connected to the audio while leaving the rest of the household in quiet.

Specification
Brand AV:Link
Lead length 5m
Connector 3.5mm stereo jack
Frequency response 20Hz-20kHz
Impedance 32 Ohm (±15%)
Power 100mW
Sensitivity 102 ± 3dB
Speaker size 30mmØ
Frequently Asked

How long is the lead?

The lead is 5m, giving you room to sit back from the television while you listen.

Does it work with older TVs and hi-fi equipment?

Yes. The headphones use a 3.5mm stereo jack and come with a 6.3mm (quarter-inch) adaptor for larger sockets on amplifiers and older sets.

Can I control the volume without the remote?

Yes. An in-line volume control sits on the lead, so you can adjust the level directly.

What size are the drivers?

The SH30T uses 30mm neodymium magnet drivers with a frequency response of 20Hz to 20kHz.

Are they easy to store?

The earcups fold flat, which keeps them compact and protected when not in use.

What is the impedance?

The impedance is 32 Ohms (±15%), with a sensitivity of 102 ± 3dB and 100mW power handling.

Shipping & Returns

Delivery UK delivery is £14.99, and delivery is free on all orders of £99 or more, in the UK and internationally.

Returns If you change your mind, you have 14 days from delivery to tell us, and a further 14 days to send the goods back. Return postage for a change-of-mind return is paid by you. Change-of-mind returns are subject to an inspection and handling deduction. See our full returns policy.

To arrange a return, call us on 020 8149 5199 or use our contact page.

See it lit, in person

Lighting looks different in a real room. Come and see our range at our showrooms in Birmingham, Hong Kong and Dubai, or talk to our design team wherever you are.

Niori lighting showroom trailer video with closeups of alabaster lighting

Why Niori

Over 20 years lighting homes worldwide

We are a specialist lighting and mirror retailer with showrooms in Birmingham, Hong Kong and Dubai, shipping to customers around the world. Our own design team is here to help, from first idea to final fitting.

Genuine products

An authorised stockist

Every product arrives brand new with the full manufacturer warranty. Found it cheaper elsewhere? Ask us about a price match.

Ordering with us

Free delivery over £99

Free delivery on orders over £99, in the UK and worldwide. Easy returns within 14 days, subject to our returns policy. Full manufacturer warranty included.

Design help

Not sure what you need?

Our design team can help you plan your lighting, share photos and videos of stock, and send samples worldwide. Book a showroom visit in Birmingham, Hong Kong or Dubai, or ask about our lighting design service.

Our Reviews

From first click to final installation, our customers share how Niori lights up their spaces. Read their words and envision what’s possible for yours.

Featured Projects

Step into our portfolio and see how we transform homes, restaurants, and commercial spaces and more, worldwide. Click here for a closer look at our latest projects.

Description

The AV:Link SH30T is a pair of stereo headphones built for television viewing, with a 5m lead that lets you sit back from the screen without pulling on the cable. An in-line volume control sits on the lead, so you can adjust the level without reaching for the remote or the set itself. The extra length means you can watch comfortably from the sofa or across the room.

Sound comes from 30mm neodymium magnet drivers with a frequency response of 20Hz to 20kHz. The impedance is 32 Ohms and sensitivity is rated at 102 ± 3dB, with 100mW of power handling. The result is clear stereo audio in a compact set of headphones. The adjustable headband and low-profile padded earcups (earpads) are made for long-lasting comfort, which matters during a full film or an evening of viewing.

The SH30T terminates in a right-angle 3.5mm stereo jack, and a 6.3mm (quarter-inch) adaptor is included so you can plug into larger amplifiers, hi-fi units and older televisions. When you have finished, the earcups fold flat for safe, space-saving storage. This is a straightforward pair of headphones that covers TV listening and general use without fuss, keeping the wearer connected to the audio while leaving the rest of the household in quiet.

Specification
Brand AV:Link
Lead length 5m
Connector 3.5mm stereo jack
Frequency response 20Hz-20kHz
Impedance 32 Ohm (±15%)
Power 100mW
Sensitivity 102 ± 3dB
Speaker size 30mmØ
Frequently Asked

How long is the lead?

The lead is 5m, giving you room to sit back from the television while you listen.

Does it work with older TVs and hi-fi equipment?

Yes. The headphones use a 3.5mm stereo jack and come with a 6.3mm (quarter-inch) adaptor for larger sockets on amplifiers and older sets.

Can I control the volume without the remote?

Yes. An in-line volume control sits on the lead, so you can adjust the level directly.

What size are the drivers?

The SH30T uses 30mm neodymium magnet drivers with a frequency response of 20Hz to 20kHz.

Are they easy to store?

The earcups fold flat, which keeps them compact and protected when not in use.

What is the impedance?

The impedance is 32 Ohms (±15%), with a sensitivity of 102 ± 3dB and 100mW power handling.

Shipping & Returns

Delivery UK delivery is £14.99, and delivery is free on all orders of £99 or more, in the UK and internationally.

Returns If you change your mind, you have 14 days from delivery to tell us, and a further 14 days to send the goods back. Return postage for a change-of-mind return is paid by you. Change-of-mind returns are subject to an inspection and handling deduction. See our full returns policy.

To arrange a return, call us on 020 8149 5199 or use our contact page.