{"product_id":"av-link-sh30t-stereo-tv-headphones-with-long-lead","title":"AV:Link SH30T Stereo TV Headphones with Long Lead","description":"\u003ch5\u003eDescription\u003c\/h5\u003e\n\u003cp\u003eThe AV:Link SH30T is a pair of stereo headphones built for television viewing, with a 5m lead that lets you sit back from the screen without pulling on the cable. An in-line volume control sits on the lead, so you can adjust the level without reaching for the remote or the set itself. The extra length means you can watch comfortably from the sofa or across the room.\u003c\/p\u003e\n\u003cp\u003eSound comes from 30mm neodymium magnet drivers with a frequency response of 20Hz to 20kHz. The impedance is 32 Ohms and sensitivity is rated at 102 ± 3dB, with 100mW of power handling. The result is clear stereo audio in a compact set of headphones. The adjustable headband and low-profile padded earcups (earpads) are made for long-lasting comfort, which matters during a full film or an evening of viewing.\u003c\/p\u003e\n\u003cp\u003eThe SH30T terminates in a right-angle 3.5mm stereo jack, and a 6.3mm (quarter-inch) adaptor is included so you can plug into larger amplifiers, hi-fi units and older televisions. When you have finished, the earcups fold flat for safe, space-saving storage. This is a straightforward pair of headphones that covers TV listening and general use without fuss, keeping the wearer connected to the audio while leaving the rest of the household in quiet.\u003c\/p\u003e\n\u003ch5\u003eSpecification\u003c\/h5\u003e\n\u003ctable class=\"spec_table\"\u003e\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eLead length\u003c\/td\u003e\n\u003ctd\u003e5m\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eConnector\u003c\/td\u003e\n\u003ctd\u003e3.5mm stereo jack\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eFrequency response\u003c\/td\u003e\n\u003ctd\u003e20Hz-20kHz\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eImpedance\u003c\/td\u003e\n\u003ctd\u003e32 Ohm (±15%)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePower\u003c\/td\u003e\n\u003ctd\u003e100mW\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSensitivity\u003c\/td\u003e\n\u003ctd\u003e102 ± 3dB\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSpeaker size\u003c\/td\u003e\n\u003ctd\u003e30mmØ\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\u003c\/table\u003e\n\u003ch5\u003eFrequently Asked\u003c\/h5\u003e\n\u003cp\u003e\u003cstrong\u003eHow long is the lead?\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eThe lead is 5m, giving you room to sit back from the television while you listen.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eDoes it work with older TVs and hi-fi equipment?\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eYes. The headphones use a 3.5mm stereo jack and come with a 6.3mm (quarter-inch) adaptor for larger sockets on amplifiers and older sets.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eCan I control the volume without the remote?\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eYes. An in-line volume control sits on the lead, so you can adjust the level directly.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWhat size are the drivers?\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eThe SH30T uses 30mm neodymium magnet drivers with a frequency response of 20Hz to 20kHz.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAre they easy to store?\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eThe earcups fold flat, which keeps them compact and protected when not in use.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWhat is the impedance?\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eThe impedance is 32 Ohms (±15%), with a sensitivity of 102 ± 3dB and 100mW power handling.\u003c\/p\u003e\n","brand":"AVSL","offers":[{"title":"Default Title","offer_id":53270420586763,"sku":"101.306UK","price":8.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0729\/8993\/3835\/files\/101306UK_0.jpg?v=1784952427","url":"https:\/\/niori.co.uk\/products\/av-link-sh30t-stereo-tv-headphones-with-long-lead","provider":"Niori","version":"1.0","type":"link"}